The patio project moves along, with initial excavation for the
second retaining wall nearing completion.

Completion of the other wall is only part of the project. Now, I get to do the same basic stuff on the other side. This wall will be easier in some ways, and more difficult in others.

As should be obvious from the excavation, it will have more curves to it. This will help to increase the patio area quite dramatically. Really, under the deck looks bigger already, excluding for the two massive pile of dirt I have in the center. But where it has the “S” curve feature, it won’t be nearly as tall- standing only about three-and-one-half feet at it’s tallest.

Aside from that, it’s more of the same. The next step is to dig down about a foot, line it with rip-rap and then fill with stone. Then I get to start building and backfilling.

Oh, almost forgot. I’ve also got to do something with that drain pipe. Don’t worry, I’ve got plans for it.